A construction site is a work environment that changes daily and hosts several companies at once. The rules therefore impose a special regime: a health and safety plan, notification to the State Labour Inspectorate before work begins, and appointment of a safety coordinator. Appointing a coordinator is mandatory on every site with more than one contractor.

What the service covers

  • Preparation of the site health and safety plan
  • Notification to the State Labour Inspectorate on the prescribed form
  • Safety coordinator during the design phase
  • Safety coordinator during the execution phase
  • Alignment of measures across all contractors and subcontractors
  • Particular attention to the works with particular risk listed in Annex 2 of the Rulebook
  • Regular site walk-throughs with a written record of shortcomings
  • Updating the plan when the programme or the contractors change

How the process works

  1. Design review

    We review the design documentation and the programme to anticipate overlaps between contractors.

  2. Preparing the plan

    The plan covers all phases, with a dedicated section on works with particular risk from Annex 2 of the Rulebook.

  3. Notification

    We prepare the notification to the State Labour Inspectorate on the prescribed form before works commence.

  4. Coordination during execution

    Regular walk-throughs, alignment between contractors, written records and updates to the plan as things change.

Frequently asked questions

When is a safety coordinator mandatory?

On every site with more than one contractor (Article 4 of the Rulebook, Official Gazette of RM no. 105/08). An exemption is possible only after consulting employer and employee representatives, and never where works with particular risk from Annex 2 are involved.

When must the Inspectorate be notified?

Notification of commencement of activity is filed eight days before starting, on the prescribed form. Contractors additionally notify the Inspectorate in writing of the location of the works before they begin.

Who bears responsibility — the developer or the contractor?

Each contractor remains responsible for its own employees. The coordinator aligns measures across contractors and monitors their application but does not assume their liability as employers.